Floating, Trunnion-Mounted & Actuated Ball Valves for Oil & Gas, Petrochemical, Energy and Process Applications.

BALL VALVES

Ball Valves | Industrial Valves

Ball Valves for Reliable Process Isolation.

Avasi Energy supplies industrial ball valves in Sabah and Malaysia, supporting isolation requirements across oil & gas, petrochemical, energy and process industries.

Our sourcing scope covers floating and trunnion-mounted ball valves, from general industrial isolation duties to project-specific API valve requirements, manual operation and complete actuated valve packages.

Each enquiry is reviewed against the specified valve design, size, pressure class, body and trim materials, bore, seat construction, end connection, service conditions, actuation, testing and documentation requirements.

Based in Kota Kinabalu, Sabah, Avasi Energy works with suitable valve manufacturers and supply partners in Malaysia and internationally to coordinate ball-valve requirements according to customer datasheets, material requisitions and project specifications.

Send Your Ball Valve RFQ

FAST ISOLATION. POSITIVE SHUT-OFF.

Quarter-Turn Flow Isolation.

A ball valve uses a bored spherical closure element that rotates through approximately 90 degrees between the open and closed positions.

When aligned with the piping bore, flow passes through the valve. When rotated to the closed position, the solid portion of the ball isolates the flow path.

The exact valve design must still be matched to the actual service conditions.

The right ball valve starts with the isolation duty — not just the size and class.


FLOATING OR TRUNNION-MOUNTED?

Two Fundamental Ball Valve Designs.

Floating Ball Valves

Compact, Proven Isolation for Suitable Applications.

In a floating ball valve, the ball is supported by the valve seats rather than mechanically anchored at both ends.

Under pressure, the ball can move slightly toward the downstream seat, contributing to the sealing action.

Depending on the manufacturer and application, configurations may include:

Floating ball valves are commonly used across industrial and process applications within the size, pressure, material and service limits of the selected design.

Send Floating Ball Valve RFQ

Trunnion-Mounted Ball Valves

Engineered for Demanding Isolation Duties.

In a trunnion-mounted design, the ball is mechanically supported by trunnions or bearings, while the seats move toward the ball to provide sealing.

This construction is widely applied in larger sizes, higher-pressure systems and demanding oil & gas or pipeline applications.

Depending on manufacturer design and project specification, requirements may include:

MIR Valve’s current API 6D portfolio, for example, offers side-entry, top-entry and fully welded trunnion ball valves with full/reduced bore, soft/metal seats and manual or actuated configurations for onshore, offshore and subsea duties. Mir Valve

Send Trunnion Ball Valve RFQ

FLOATING VS TRUNNION

The Design Must Match the Duty.

RequirementFloating Ball ValveTrunnion-Mounted Ball Valve
Ball supportBall supported through seat arrangementBall mechanically supported
Common positioningGeneral industrial / suitable process isolationLarger size, higher pressure and demanding applications
Operating torqueDesign dependentTrunnion support can assist with larger/high-pressure designs
Body configurationsOne, two or three-pieceSide-entry, top-entry, fully welded and others
ActuationManual or actuatedManual or actuated
Selection basisService, size, class, materialService, size, class, pipeline/project requirements

This is not a “good versus better” comparison.

The correct design follows the service conditions and project specification.


FULL BORE OR REDUCED BORE?

The Flow Path Matters.

Full Bore

A full-bore ball valve is designed with an internal flow passage intended to closely correspond to the adjoining piping bore according to the governing valve standard and manufacturer design.

Full-bore valves may be required where the piping system calls for minimal internal restriction or, in certain pipeline designs, pigging capability.

Pigging suitability should be confirmed against the actual valve design and project requirements rather than assumed solely from the phrase “full bore”.

Reduced Bore

A reduced-bore ball valve uses a smaller internal passage through the ball.

This can offer a more compact or economical valve solution where the resulting restriction and pressure loss are acceptable to the process design.

API 608 specifically recognises full-bore and reduced-bore metal ball-valve configurations, while API 6D ball-valve manufacturers also offer both arrangements.

Bore selection should follow the piping and process requirement — not preference alone.


SOFT SEATED OR METAL SEATED?

Seat Construction Changes the Application.

Soft-Seated Ball Valves

Soft-seat designs use polymeric or other engineered non-metallic seating materials.

Depending on the selected material and valve design, they can provide tight shut-off for many general hydrocarbon, gas and industrial process applications.

Seat-material selection must consider:

Metal-Seated Ball Valves

Metal-to-metal seating may be specified for demanding services involving conditions such as:

The exact suitability depends on manufacturer design, coating/hard-facing technology, leakage acceptance and service conditions.

Avasi Energy sources the seat design specified by the customer’s engineering requirement rather than presenting one seat construction as universally superior.


BODY CONSTRUCTION

Different Designs for Different Maintenance & Installation Requirements.

For trunnion and engineered ball valves, the body configuration can form an important part of the project requirement.

Side-Entry Ball Valves

Bolted side-entry designs allow the body to be disassembled after removal from the piping system where supported by the manufacturer design.

Top-Entry Ball Valves

Top-entry designs provide access to internal components from the upper body area and may be selected where in-line maintenance philosophy forms part of the project specification.

Fully Welded Ball Valves

Fully welded body construction eliminates conventional bolted body joints and is often associated with selected pipeline, underground or long-term buried-service applications.

Final selection should follow project design and maintenance philosophy.


END CONNECTIONS

The Valve Must Match the Piping System.

Depending on ball-valve design and application, end connections may include:

The connection must align with:

For butt-weld valves, end preparation and transition requirements should be reviewed against the connecting pipe specification.


MANUAL & ACTUATED BALL VALVES

From Quarter-Turn Operation to Complete Automated Packages.

Ball valves are particularly suited to automated quarter-turn operation.

Avasi Energy can coordinate operating configurations including:

  1. Manual
    • Lever
    • Gear Operator
  2. Pneumatic Actuation
    • For remote on-off service and selected automated duties.
  3. Electric Actuation
    • For motor-operated valve requirements and integration with plant electrical/control systems.
  4. Hydraulic Actuation
    • For selected pipeline, emergency or high-torque applications.
  5. Gas-Over-Oil / Specialist Actuation
    • Where specifically required for pipeline or project applications and supported by the selected manufacturer/integrator.

Avasi can coordinate complete actuated ball-valve packages through suitable valve manufacturers, actuator suppliers and integration partners according to project requirements.


ACTUATED VALVE PACKAGE

The Actuator Is Only One Part of the System.

Depending on project requirements, an actuated ball-valve package may include:

Actuator sizing should be based on the valve manufacturer’s torque data, differential pressure, operating conditions, required safety factor, operating time and fail position.


DBB, DIB & SEAT ARRANGEMENTS

Specify the Required Isolation Philosophy.

For selected trunnion-mounted and pipeline ball valves, project specifications may require particular seat and isolation arrangements.

These may include terminology such as:

The terminology should be applied according to the governing standard and actual valve design.

Different seat arrangements can behave differently with respect to body-cavity pressure and isolation performance, so don’t treat “DBB” and “DIB” as marketing synonyms.

Where these functions are required, the enquiry should clearly state the project specification and required seat arrangement.


BODY, BALL, STEM & SEAT MATERIALS

Material Selection Extends Beyond the Valve Body.

Depending on service conditions, ball-valve materials may include:

  1. Carbon Steel

    • Common for oil & gas and general process applications.
  2. Low-Temperature Carbon Steel

    • Where low-temperature toughness requirements apply.
  3. Stainless Steel

    • For selected corrosive process applications.
  4. Duplex & Super Duplex Stainless Steel

    • For selected offshore, marine and corrosive-service environments.
  5. Alloy Steel

    • For elevated-temperature or specialised services.
  6. Nickel & Special Alloys

    • For severe corrosion or project-specific applications.

The complete material requirement may include separate specifications for:

Body material alone does not define the complete valve metallurgy.


SPECIAL SERVICE REQUIREMENTS

When Standard Ball Valve Supply Is Not Enough.

Depending on the project, additional requirements may include:

  1. Fire-Safe Qualification

    • Ball valves may require fire-tested design according to the applicable project standard.
    • API 607 currently covers fire testing for quarter-turn valves and valves equipped with non-metallic seats. API lists its 8th edition as the current published edition.
  2. Fugitive Emissions

    • Where stem and body-joint emissions are controlled by project requirements, qualification may involve:
      • API 641
      • or
      • ISO 15848
      • depending on the project specification.
    • API 641 specifically addresses fugitive-emission type testing of quarter-turn valves, while ISO 15848-1 remains current for industrial-valve fugitive-emission qualification.
  3. Sour Service

    • Where H₂S-containing service requires material restrictions and qualification under the applicable project requirements associated with NACE MR0175 / ISO 15156.
  4. Cryogenic Service

    • May require project-specific materials, extended stem/bonnet arrangements, seat construction and cryogenic testing.
  5. High-Temperature Service

    • May require metal seats, special packing, stem sealing and materials suitable for the operating temperature.
  6. Buried / Underground Service

    • May require extended stems, sealing arrangements, coating and installation features according to pipeline requirements.
  7. Anti-Static Requirements

    • Where electrical continuity between ball, stem and body is specified.
  8. Anti-Blowout Stem

    • Where required by valve design and project specification.

All special-service features should be supported by the selected manufacturer’s design and qualification documentation.


STANDARDS & SPECIFICATIONS

Different Ball Valve Duties Use Different Standards.

Depending on application and project specification, requirements may include:

  1. API 6D

    • For applicable pipeline and piping valve requirements.
  2. API 608

    • Metal ball valves with flanged, threaded and welding ends.
  3. ASME B16.34

    • Valve pressure-temperature ratings, materials, dimensions, NDE, testing and marking for applicable valve construction.
  4. ASME B16.10

    • Face-to-face and end-to-end dimensions where applicable.
  5. API 598

    • Valve inspection and testing where specified.
  6. API 607

    • Fire testing for applicable quarter-turn valves.
  7. API 641 / ISO 15848

    • Fugitive-emission qualification where specified.
  8. NACE MR0175 / ISO 15156

    • For applicable H₂S-containing oil & gas environments.

TESTING, INSPECTION & DOCUMENTATION

Confidence Beyond the Valve.

Depending on valve design, manufacturer capability and project specification, Avasi Energy can coordinate:

  1. Pressure & Leakage Testing
  2. Shell / Body Hydrostatic Test
  3. High-Pressure Seat Test
  4. Low-Pressure Pneumatic Seat Test
  5. Closure / Leakage Test
  6. Full Differential Pressure Test, where specified and applicable
    • API 598 is a key valve inspection and testing standard, while API 6D contains additional requirements for applicable pipeline valves.
  7. Factory Acceptance Test — FAT
    • Customer or third-party witnessed testing according to the approved ITP/procedure where required.
  8. Ball Valve Torque Testing
    • Where included within the project requirement.
  9. Fugitive Emission Testing
    • Where specified and supported by the manufacturer’s qualification/testing arrangement.
  10. Material Verification
    • MTC / MTR
    • PMI
    • Hardness Testing
    • NDE / NDT
    • Third-Party Inspection — TPI
      • By customer-approved inspection agencies where required.

PROJECT DOCUMENTATION

The Valve Is Only One Part of the Deliverable.

Depending on project scope, the valve documentation package may include:

The exact document index should be agreed during technical and commercial review.

For project valves, documentation is part of the supply — not an afterthought.


TECHNICAL ENOUGH FOR ENGINEERING. CLEAR ENOUGH FOR PROCUREMENT.

Confidence Beyond the Valve.

Engineering teams need confidence that the valve:

Procurement teams need confidence that:

Avasi Energy coordinates both sides of that requirement.

Correct Duty. Clear Compliance. Documented Supply.


WHAT TO SEND US FOR AN ACCURATE BALL VALVE RFQ

Help Us Quote the Correct Valve.

  1. Basic Valve Information
    • Size / NPS
    • Pressure Class / Rating
    • Floating or Trunnion, if specified
    • Full or Reduced Bore
    • Body Construction, if specified
    • End Connection
    • Quantity
  2. Materials
    • Body Material
    • Ball / Closure Material
    • Stem Material
    • Seat Material
    • Seal / Packing Requirement
  3. Service Conditions
    • Process Fluid
    • Design Pressure
    • Operating Pressure
    • Design Temperature
    • Operating Temperature
    • Sour-Service Requirement
  4. Seat / Isolation Requirement
    • Soft or Metal Seat
    • Seat Leakage Requirement
    • Self-Relieving / DPE Requirement
    • DBB / DIB Requirement, where applicable
  5. Special Requirements
    • Fire Safe
    • Fugitive Emission
    • Anti-Static
    • Cryogenic
    • High Temperature
    • Buried Service
    • Piggable / Full-Bore Requirement
  6. Operation
    • Lever
    • Gear
    • Pneumatic
    • Electric
    • Hydraulic / Specialist Actuation
  7. For Actuated Packages
    • Fail Open / Fail Close / Fail in Place
    • Operating Time
    • Power / Instrument Air
    • Solenoid Requirement
    • Limit Switch
    • Positioner
    • Local Controls
  8. Inspection & Documentation
    • FAT
    • TPI
    • MTC
    • ITP
    • Testing Requirement
    • Documentation / MRB
    • Approved Manufacturer List
    • Required Delivery Date

Where available, attach:

Example

Manual operated:

Ball Valve, 6" Class 600, Trunnion-Mounted, Full Bore, RF, Carbon Steel Body, SS316 Trim, Soft Seated, API 6D, Gear Operated, Fire-Safe Requirement, MTC 3.1 and API Testing Documentation Required.

Actuated example:

Ball Valve, 12" Class 900, Trunnion-Mounted, Full Bore, RTJ, material and seat arrangement as per datasheet, complete with Pneumatic Actuator, Fail Close, Solenoid Valve, Limit Switch and accessories, FAT/TPI and documentation as per project specification.

Examples only. Final description must follow the actual project datasheet and specification.

Send Your Ball Valve RFQ

FROM REQUIREMENT TO DELIVERY

A Specification-Driven Valve Supply Process.

  1. Review
    • We review the required valve specification, testing and documentation requirements.
  2. Manufacturer Selection
    • Suitable valve options are identified through our manufacturer and supply network.
  3. Technical Compliance
    • The proposed pipe is reviewed against the agreed technical and commercial scope.
  4. Actuation, Inspection & Testing
    • Where required, actuator integration, FAT, TPI, pressure testing and project inspection requirements are coordinated.
  5. Documentation & Delivery
    • Required documentation, final release and logistics are coordinated through completion of the supply package.

Requirement Reviewed. Valve Sourced. Compliance Documented.


SUPPORTING SABAH’S INDUSTRIAL REQUIREMENTS

Based in Sabah. Connected Beyond Sabah.

Avasi Energy is based in Kota Kinabalu, Sabah, supporting pipe and piping-material requirements for customers, projects and industrial operations in East Malaysia.

Our local presence is supported by access to manufacturers and supply partners in Malaysia and internationally, allowing us to coordinate requirements according to project specifications rather than restricting customers to a single source or product range.

This positioning is increasingly relevant as Sabah’s OGSE ecosystem develops. PETRONAS reported in February 2026 that contracts secured by recognised Sabah-based OGSE vendors had grown substantially since 2021.

We support requirements associated with:

Local Presence. Wider Sourcing Capability.


COMPLETE THE FLOW-CONTROL PACKAGE

Need Other Valve Types?

Avasi Energy also supplies:

Gate Valves

Isolation valves for fully open / fully closed service.

Globe Valves

For throttling, regulation and shut-off duties.

Check Valves

For non-return and reverse-flow prevention.

Butterfly Valves

Compact quarter-turn isolation and selected flow-control applications.

Piping Products

Pipes, fittings, flanges, gaskets, bolting, line blanks and Restriction Orifices.


FREQUENTLY ASKED QUESTIONS

What is the difference between a floating and trunnion ball valve?

A floating ball is supported through the valve's seat arrangement, while a trunnion-mounted ball is mechanically supported. Trunnion designs are widely used for larger, higher-pressure and demanding oil & gas applications, although final selection depends on the manufacturer design and project specification.

What is the difference between full bore and reduced bore?

A full-bore valve provides a larger internal flow path aligned more closely with the piping bore, while a reduced-bore valve has a smaller internal passage. Selection depends on pressure-loss, process and piping requirements.

Does full bore automatically mean piggable?

No. Where pigging is required, the complete valve bore geometry and manufacturer's design should be confirmed against the project pigging requirement.

What is the difference between API 6D and API 608 ball valves?

API 6D addresses applicable pipeline and piping valves, while API 608 specifically covers metal ball valves for petroleum, petrochemical and industrial applications with defined end-connection and pressure-class scope. The applicable standard should follow the project specification.

Can Avasi supply fire-safe ball valves?

Yes, where specified. Avasi can source valves with applicable fire-test qualification such as API 607 or other project-specified requirements, subject to manufacturer certification.

Can Avasi supply DBB or DIB ball valves?

Yes, where required. The exact seat arrangement and isolation requirement must be defined by the project specification because DBB and DIB are not interchangeable terms.

Can Avasi supply actuated ball valves?

Yes. Avasi can coordinate pneumatic, electric, hydraulic and selected specialist actuator packages through suitable manufacturers and integration partners.

Can Avasi arrange FAT and third-party inspection?

Yes. FAT, TPI and project-specific testing can be coordinated where required and included within the agreed supply scope.

Does Avasi manufacture ball valves?

No. Avasi Energy operates as a sourcing and supply partner for industrial valves, working with suitable manufacturers according to customer requirements.


Looking for Ball Valves?

Send Avasi Energy your valve datasheet, RFQ, material requisition, piping class or project specification.

Whether your requirement involves a floating ball valve, trunnion-mounted API valve, full-bore isolation valve, metal-seated valve or complete actuated package, our team will review the requirement and coordinate suitable sourcing options according to the specified technical, testing, documentation and delivery requirements.

Send Your Ball Valve RFQ

AVASI ENERGY SDN BHD

Piping. Flow Control. Smarter Sourcing.